Fitzpatrick Head Office, Hoddesdon- Office Basement
Client: Fitzpatrick Contractors Ltd
Date: June 2007
Product: Prestressed Vertical Cantilever Walling
Milbury was involved in the early stages of the project and was able to meet the complexity of the design and benefit the overall program of works. Site conditions were demanding due to numerous trades operating simultaneously however the steel frame and perimeter wall erection teams worked very closely together to ensure the rigid program could be achieved.
Milbury achieved a time saving of approximately two weeks to the original program making sure that the client was very satisfied.
© Milbury Systems Ltd 2012
Last updated: March 2012