Ipswich Flood Defence
Client: Jacksons CivilsPre-stressed panels and copings were constructed to form flood relief walling. Milbury provided pre-cast concrete as an alternative to in-situ walling enabling all the pre cast to be handled by one provider which in turn met the requirements of Jackson Civils in a shorter time.
The speed of the installation allowed Milbury to provide a cost effective solution.
© Milbury Systems Ltd 2012
Last updated: March 2012